Highways Case Study 
 
Road Widening & New Traffic Light Crossing, A416 Trunk Road, Chesham, Buckinghamshire 
 
This scheme was required as part of the development of a new Medical centre facility. To accommodate increased traffic flows whilst maintaining the safety of pedestrians and road users alike a new right-hand turn lane into the site was required, plus an existing Zebra crossing adjacent the site was upgraded to a traffic light controlled (Puffin) crossing. The existing road was in a poor state of repair requiring it to be fully re-laid for the whole of the site frontage plus the approaches to the new traffic light crossing. Complications on the site included the relocation of high voltage cabling and drainage culvert plus phasing the works to maintain at least one lane of traffic flow at all times. 
 
PRP Responsibilities 
 
Production of Tender Package of information & analysis of received tenders. 
Production of construction specifications & drawings to Adoptable Standards. 
Full contract administration for the works carried out under a Section 278 Agreement. 
Supervision & Inspection of works for Interim Valuations. 
Liaison & Negotiation with the County Council Highways Authority & Statutory Utility Providers. 
Road Widening
Road Widening
Road Widening